Solar in one minute
Panels make direct-current electricity from sunlight. An inverter changes it into the alternating-current electricity your home uses. Your home uses solar power first. Extra production may go to the grid or charge a battery. Solar can reduce utility purchases, but it does not automatically remove every utility charge.
kW, kWh, and solar offset
Kilowatts, or kW, describe the system's power capacity. Kilowatt-hours, or kWh, measure energy produced or used over time. Solar offset is the share of your annual electricity use the system is expected to produce. A useful estimate starts with twelve months of kWh use, not only the dollar amount of one bill.
Roof, shade, and system size
A good design accounts for roof direction, tilt, seasonal shade, usable area, local weather, code setbacks, and future electricity needs. A satellite image is a starting point, not a roof inspection. Ask for the annual production estimate and the assumptions behind it.
Net metering and utility approval
Net metering is a billing rule for eligible electricity sent to the grid. The utility measures power flowing both ways and applies credits under its current tariff. Interconnection is the utility's approval process. Permission to operate is the final approval to turn the system on for normal use.
Cash, loan, lease, or PPA
Cash avoids financing cost. A loan lets you own the system but can include interest and dealer fees. With a lease or power purchase agreement, a third party owns the system. Compare total cost, payment increases, buyout terms, home-sale rules, and who receives incentives.
Do you need a battery?
A battery stores electricity for later and can support selected loads during an outage when the system is designed for backup. Panels alone usually shut down during a grid outage. Ask which circuits will run, for how long, and whether large loads are supported.
Proposal red flags
Be cautious with pressure to sign immediately, claims of free solar or guaranteed zero bills, missing cash price, vague equipment, and savings based on unexplained utility-rate increases. Get system size, annual production, equipment models, total price, financing cost, warranties, and contractor responsibilities in writing.
What happens after signing
A typical project moves through site survey, final design, local permits, utility application, installation, inspection, and permission to operate. Ask who owns each step and when you will receive copies of approvals and final system documents.